Send Message
Home ProductsRailway Bogie

85km/h Tunnel Cleaning Vehicle Bogie With Welded One Piece Frame

Certification
China Jiangsu Railteco Equipment Co., Ltd. certification
China Jiangsu Railteco Equipment Co., Ltd. certification
Customer Reviews
Railteco is a professional railway axle manufacturer, we have cooperated for more than two years and no quality problem was founded. I believe Railteco will always be my business partner after ten or twenty years.

—— VALE

Competitive price and excellent service is Railteco's advantage!

—— DB

I'm Online Chat Now

85km/h Tunnel Cleaning Vehicle Bogie With Welded One Piece Frame

85km/h Tunnel Cleaning Vehicle Bogie With Welded One Piece Frame
85km/h Tunnel Cleaning Vehicle Bogie With Welded One Piece Frame 85km/h Tunnel Cleaning Vehicle Bogie With Welded One Piece Frame 85km/h Tunnel Cleaning Vehicle Bogie With Welded One Piece Frame

Large Image :  85km/h Tunnel Cleaning Vehicle Bogie With Welded One Piece Frame

Product Details:
Place of Origin: China
Brand Name: Railteco
Certification: AAR ISO
Model Number: RTHZ29
Payment & Shipping Terms:
Minimum Order Quantity: One pcs
Price: Negotiable
Packaging Details: Railteco Standard Packing
Delivery Time: 4 months after advance payment
Payment Terms: L/C, T/T
Supply Ability: According to customer's requirement

85km/h Tunnel Cleaning Vehicle Bogie With Welded One Piece Frame

Description
Name: Rail Engineering Vehicle Bogie RTHZ29 Axle Load: 16t
Tare Weight: 5.4t Running Speed(Max): 85km/h
Diameter Of Wheels: Ø920mm Fixed Wheelbase: 2000mm
High Light:

Tunnel Cleaning Vehicle Bogie

,

Welded One Piece Frame Bogie

,

85km/h Railway Bogie

Type RTHZ29 Railcar Bogie For Tunnel Cleaning (Rail engineering vehicle)

 

Description of Rail Engineering Vehicle Bogie RTHZ29:

This kind of bogie is used for tunnel cleaning vehicle. The bogie adopts hydraulic drive and is mainly composed of powered wheelset, frame assembly, spring suspension assembly, axle box assembly, brake unit, rubber side bearing, speed sensor and ground device.

 

The TCV power bogie adopts a welded one-piece rigid frame, featuring high construction speed and light weight under the unsprang mass. Using rubber reactor side bearing bearer, the center-pin traction structure, and the first-stage suspension adopts the axle box positioning structure; Lenol damping structure using a shock absorber, the damping can satisfy different requirements of the vehicle empty weight force. The stability of the snake style motion bogie is improved by using rubber side bearing. The braking mode adopts a single side brake unit with parked function, which makes the structure of the bogie more compact and the braking performance more reliable.

 

The bogie is simple in structure, reliable in strength, easy to operate and maintain, more versatile, it also could be used for railway construction vehicles with similar function and structure.

 

Main Technical Data of Rail Engineering Vehicle Bogie RTHZ29:

Gauge 1435mm
Axle Load 16t
Tare Weight 5.4t
Fixed Wheelbase 2000mm
Max. Running Speed 85km/h
Diameter of wheel Ø920mm

 

85km/h Tunnel Cleaning Vehicle Bogie With Welded One Piece Frame 0

 

 

85km/h Tunnel Cleaning Vehicle Bogie With Welded One Piece Frame 1

 

85km/h Tunnel Cleaning Vehicle Bogie With Welded One Piece Frame 2

 

 

 

 

 

 

Contact Details
Jiangsu Railteco Equipment Co., Ltd.

Contact Person: Ms. Rhea

Tel: 86-15051716108

Fax: 86-512-82509835

Send your inquiry directly to us (0 / 3000)